Kingston Ash Release

Administrative Record Documents Available for Public Review and Comment

The Tennessee Valley Authority is working with the Environmental Protection Agency to recover the site of the Kingston Fossil Plant ash spill. As part of that process, important site documents have been placed in the Administrative Record and are available for public review.  The Administrative Record includes documents that form the basis for the selection of the methods TVA is using to remove ash from the river and area east of Dike 2. Documents in the Administrative Record may include, but are not limited to, inspection reports, test results, the Action Memorandum, and work plans. All interested persons are encouraged to review the documents.

Site documents can be read and reviewed on this Web site or at the following locations:

TVA Outreach Center
509 N. Kentucky Street
Kingston, Tennessee
(865) 632-1700

Kingston Public Library
1004 Bradford Way
Kingston, Tennessee
(865) 376-9905

These same documents are available on computer disk at the following location:

Harriman Public Library
601 Walden Street
Harriman, Tennessee
(865) 882-3195

TVA conducts public comment periods to solicit public input on important site documents and the site recovery process.  To find out what public comment periods are in process and how to participate, please click here.

Index of Documents in Adminstrative Record

Nbr Date Author Agency Title Pages Type*
1 01/10/2009 EPA Transfer of Lead Agency Authority 1 G
2 01/12/2009 TDEC Commissioner's Order 15 G
3 Feb. 2009 Shaw Environmental, Inc. Phase I Emory River Dredging Plan Kingston Fossil Plant Ash Recovery Project 50 TC
4 02/18/2009 TDEC Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Interim Scour Protection of Ash Pond Dike C in Affected Waters of the State and Notification to the U.S. Army Corps of Engineers 3 G
5 02/24/2009 TVA RE: KIF Ash Processing Area Wick Drains 1 TC
5-2 02/24/2009 TVA RE: KIF Ash Processing Area Wick Drains   TC
6 02/25/2009 TDEC Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Request for Use of Wick Drains in Ash Processing Area 7 TC
7 02/25/2009 TDEC RE: Phase I Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-001 1 TC
8 Mar-2009 TVA Kingston Fossil Plant - Fly Ash Recovery Projecct - Sampling Plan for Phase 1 Dredging Operations 60 TC
9 03/02/2009 TDEC Re : Phase 1 Emory River Dredging  Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-0001 1 TC
10 03/02/2009 TVA Corrective Action Plan For The TVA Kingston Fossil Plant Ash Release 76 G
11 03/03/2009 TDEC RE: TDEC Response letter - TVA dredging  plan 1 TC
12 03/18/2009 Environmental Standards, Inc. Quality Assurance Project Plan - Phase 1 Emory River Dredging - Kingston Fossil Plan Ash Recovery Project 146 TC
13 03/19/2009 EPA Re: EPA Approval of sampling plan and QAPP for Phase 1 Dredging Plan.txt 1 TC
14 03/20/2009 TVA Tennessee Valley Authority (TVA) - Commissioner's Order, Case Number OGC09-0001 - Request for Authorization to use Polymers to Enhance Treatment of Dredge Return Water 21 TC
15 04/02/2009 TVA Tennessee Department of Environment and Conservation Commissioners Order, Case No. OGC09-0001 - Interim Drainage Plan and Controls - Ash Release Area 12 G
16 04/03/2009 EPA RE: TVA Interim Drainage Plan and Controls 1 G
17 04/03/2009 TN Division of Water Pollution Control Re KIF Interim Drainage Plan hml 1 G
18 04/06/2009 EPA RE: KIF Interim Drainage Plan 4 G
19 05/04/2009 TVA/Jacobs Ash Loading Test Plan 11 TC
20 05/07/2009 TDEC Response to Comments of the Ash Loading Test 1 TC
21 05/11/2009 EPA Administrative Order 33 G
22 05/22/2009 TVA Railcar Unloading Operation Work Plan 3 TC
23 05/22/2009 TVA Rail Spur Construction Work Plan 26 TC
24 05/22/2009 TVA Ash Movement East of Dike #2 Work Plan 4 TC
25 05/22/2009 TVA Construction/Implementation of Barge Offloading Area Work Plan 6 TC
26 05/22/2009 TVA Work Plan for Dredge Relocation R0 5 TC
27 05/29/2009 TVA Access Channel Construction and Debris Removal Operations Work Plan 7 TC
28 06/01/2009 TVA Report to Our Community - June 2009 10 G
29 06/09/2009 TVA Time Critical Land-Based Ash Removal East of Dike #2 Work Plan 5 TC
30 06/09/2009 TVA Settling Area Outlet Work Plan 4 G
31 06/10/2009 TVA Test Embayment Program 168 TC
32 06/10/2009 TVA Test Embankment Program 6 NTC
33 06/09/2009 TVA Ash Stacking Height in Processing Area Work Plan 2 TC
34 06/19/2009 TVA Swan Pond Road Construction Entrance Work Plan 3 G
35 06/19/2009 TVA Cenosphere Collection Area Consolidation Work Plan 5 TC
36 06/19/2009 TVA Swan Pond Embayment Sampling Plan 7 TC
37 06/19/2009 TVA Clean Water Ditch in the East Embayment Work Plan 4 TC
38 06/22/2009 TVA Loading Work Plan 6 TC
39 06/30/2009 TVA Site Storm Water Management Plan 82 G
40 06/30/2009 TVA Time Critical Land-Based Ash Removal East of Dike #2 Work Plan (Revised) 13 TC
41 06/30/2009 TDEC Disposal of Coal Ash Generated during the TVA Kingston Coal Ash Response 4 TC
42 06/30/2009 Jacobs Site Wide Safety and Health Plan 319  
43 07/02/2009 TVA Offsite Ash Disposal Options Plan 20 TC
44 07/13/2009 TVA Rim Ditch Hydraulic Improvements Work Plan 5 TC
45 07/20/2009 TVA Rim Ditch Structural Improvements Work Plan 7 TC
46 07/20/2009 TVA Phase I Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in AL, KY and TN 3 TC
47 07/20/2009 TVA Piezometer 09-400 Abandonment Work  Plan 4 G
48 08/03/2009 Jacobs, for TVA Revised Site Dredging Plan July 2009 with Attachments 188 TC
49 08/05/2009 TVA Final Revised Action Memo with ARARs 23 TC
50 08/14/2009 TVA Site Dust Control and Air Monitoring Plan 26 G
51 08/14/2009 TVA Revised Temporary Ash Stockpile   94 TC
52 08/20/2009 TVA Financial expenditure report, the public notice of availability of the administrative record and the statement regarding the schedule for development of other work plans 105 G
53
08/20/2009 TVA Construction Site Security Plan (Revised)  9 G
54
08/25/2009 TVA Approved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee Rivers 86 G
55 09/15/2009 TVA Transmittal Cover for Regulatory Submittal - Wet Ash Storage to Support Time Critical Land Signed Version 6 TC
56 10/16/2009 TVA EE/CA Work Plan 136 NTC
57 10/16/2009 TVA Draft Community Involvement Plan 79 G
58 10/19/2009 TVA Work Plan for Vehicle Wheel Wash and Decontamination 5 G
59 10/27/2009 TVA Approved Technical Assistance Plan and Draft RCCAG agreement 18 G
60 10/23/2009 TVA Transmittal Cover for Regulatory Submittal - Revised Cenosphere Collection Area Consolidation Work Plan Signed Version 5 TC
61 10/30/2009 TVA Settling Basins Maintenance and Clean Out Plan 3 G
62 11/10/2009 TVA Transmittal Cover for Regulatory Submittal - Lime Test Work Plan (approved) 4 TC
63 11/10/2009 TVA Transmittal Cover for Regulatory Submittal - Time Critical Ash Removal from East Embayment Work Plan (Approved document) 7 TC
64 11/10/2009 TVA Transmittal Cover for Regulatory Submittal - Technical Memorandum KIF Rainfall Sampling Events 5 TC
65 11/11/2009 TVA Approved SWPP addendum 2 TC
66 11/20/2009 TVA Transmittal Cover for Regulatory Submittal -Ball Field Modifications - Road & Drainage Work Plan 5 TC
67 11/25/2009 TVA Transmittal Cover for Regulatory Submittal - Excavator Removal 32 TC
68 11/30/2009 TVA Approved Data Management Plan 54 G
69 11/30/2009 TVA Construction of lateral expansion facilities - Phase 1 Work Plan 4 TC
70 12/03/2009 TVA Addendum to Construction of Lateral Expansion Facilities Phases 1 Approved Version 11 TC
71 12/02/2009 TVA Dike C Risk Mitigation Work Plan 64 TC
72 12/11/2009 TVA Mechanical Dewatering for Treatment of Ash Pond FinesWork Plan. 8 TC
73 12/09/2009 TVA Rail Modifications Work Plan 6 TC
74 12/10/2009 TVA Relic Area Piezometer Installation Work Plan 9 TC
75 12/18/2009 TVA Quality Assurance Project Plan for the TVA Kingston Ash Recovery Project(Approved) 227 TC
76 1/8/2010 TVA Settling Areas 1A & 2A Maintenance and Clean Out WorkPlan 5 TC
77 1/7/2010 TVA New Sluice Trench Road Work Plan 43 TC
78 1/18/2010 TVA Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) 43 TC
79 1/19/2010 TVA Approval to move 20 inch dredge to section 4 1 TC
80 1/19/2010 TVA Engineering Evaluation/Cost Analysis (EE/CA) Various NTC
81 1/21/2010 TVA Railroad Modification Work Plan 27 TC
82 1/22/2010 TVA EECA Work Plan Responsiveness Summary 36 NTC
83 1/22/2010 TVA Transmittal Cover for Regulatory Submittal - Lime Application in Ballfield 4 TC
84 2/18/2010 TVA Transmittal Cover for Regulatory Submittal - Ash Pond Mechanical Dredging Work Plan 6 TC
85 2/26/2010 TVA Transmittal Cover for Regulatory Submittal - Ball Field Reconfiguration Work Plan 11 TC
86 2/26/2010 TVA Transmittal Cover for Regulatory Submittal - Skimmer Wall Debris Removal Work Plan 5 TC
87 3/2/2010 TVA Transmittal Cover for Regulatory Submittal - Construction Operation of Excavation Workign Platform Extended Platform on Lateral Expansion Work Plan 8 TC
88 3/2/2010 TVA Approved Revised Site Wide Safety and Health Plan 3 G
89 3/4/2010 TVA Transmittal Cover for Regulatory Submittal - Test Embankment Buttress Work Plan, Revision 0 60 TC
90 3/5/2010 TVA Transmittal Cover for Regulatory Submittal - Weir 1 Removal Work Plan 8 TC

Type Definitions: G - General, TC - Time Critical, NTC - Non-Time Critical

 

 