The Tennessee Valley Authority is working with the Environmental Protection Agency to recover the site of the Kingston Fossil Plant ash spill. As part of that process, important site documents have been placed in the Administrative Record and are available for public review. The Administrative Record includes documents that form the basis for the selection of the methods TVA is using to remove ash from the river and area east of Dike 2. Documents in the Administrative Record may include, but are not limited to, inspection reports, test results, the Action Memorandum, and work plans. All interested persons are encouraged to review the documents.
These same documents are available on computer disk at the
following location:
TVA conducts public comment periods to solicit public input on important site documents and the site recovery process. To find out what public comment periods are in process and how to participate, please click here.
|
|
|
|
|
|
| Nbr |
Date |
Author Agency |
Title |
Pages |
Type* |
| 1 |
01/10/2009 |
EPA |
Transfer of Lead Agency Authority |
1 |
G |
| 2 |
01/12/2009 |
TDEC |
Commissioner's Order |
15 |
G |
| 3 |
Feb. 2009 |
Shaw Environmental, Inc. |
Phase I Emory River Dredging Plan Kingston Fossil Plant Ash Recovery Project |
50 |
TC |
| 4 |
02/18/2009 |
TDEC |
Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Interim Scour Protection of Ash Pond Dike C in Affected Waters of the State and Notification to the U.S. Army Corps of Engineers |
3 |
G |
| 5 |
02/24/2009 |
TVA |
RE: KIF Ash Processing Area Wick Drains |
1 |
TC |
| 5-2 |
02/24/2009 |
TVA |
RE: KIF Ash Processing Area Wick Drains |
|
TC |
| 6 |
02/25/2009 |
TDEC |
Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Request for Use of Wick Drains in Ash Processing Area |
7 |
TC |
| 7 |
02/25/2009 |
TDEC |
RE: Phase I Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-001 |
1 |
TC |
| 8 |
Mar-2009 |
TVA |
Kingston Fossil Plant - Fly Ash Recovery Projecct - Sampling Plan for Phase 1 Dredging Operations |
60 |
TC |
| 9 |
03/02/2009 |
TDEC |
Re : Phase 1 Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-0001 |
1 |
TC |
| 10 |
03/02/2009 |
TVA |
Corrective Action Plan For The TVA Kingston Fossil Plant Ash Release |
76 |
G |
| 11 |
03/03/2009 |
TDEC |
RE: TDEC Response letter - TVA dredging plan |
1 |
TC |
| 12 |
03/18/2009 |
Environmental Standards, Inc. |
Quality Assurance Project Plan - Phase 1 Emory River Dredging - Kingston Fossil Plan Ash Recovery Project |
146 |
TC |
| 13 |
03/19/2009 |
EPA |
Re: EPA Approval of sampling plan and QAPP for Phase 1 Dredging Plan.txt |
1 |
TC |
| 14 |
03/20/2009 |
TVA |
Tennessee Valley Authority (TVA) - Commissioner's Order, Case Number OGC09-0001 - Request for Authorization to use Polymers to Enhance Treatment of Dredge Return Water |
21 |
TC |
| 15 |
04/02/2009 |
TVA |
Tennessee Department of Environment and Conservation Commissioners Order, Case No. OGC09-0001 - Interim Drainage Plan and Controls - Ash Release Area |
12 |
G |
| 16 |
04/03/2009 |
EPA |
RE: TVA Interim Drainage Plan and Controls |
1 |
G |
| 17 |
04/03/2009 |
TN Division of Water Pollution Control |
Re KIF Interim Drainage Plan hml |
1 |
G |
| 18 |
04/06/2009 |
EPA |
RE: KIF Interim Drainage Plan |
4 |
G |
| 19 |
05/04/2009 |
TVA/Jacobs |
Ash Loading Test Plan |
11 |
TC |
| 20 |
05/07/2009 |
TDEC |
Response to Comments of the Ash Loading Test |
1 |
TC |
| 21 |
05/11/2009 |
EPA |
Administrative Order |
33 |
G |
| 22 |
05/22/2009 |
TVA |
Railcar Unloading Operation Work Plan |
3 |
TC |
| 23 |
05/22/2009 |
TVA |
Rail Spur Construction Work Plan |
26 |
TC |
| 24 |
05/22/2009 |
TVA |
Ash Movement East of Dike #2 Work Plan |
4 |
TC |
| 25 |
05/22/2009 |
TVA |
Construction/Implementation of Barge Offloading Area Work Plan |
6 |
TC |
| 26 |
05/22/2009 |
TVA |
Work Plan for Dredge Relocation R0 |
5 |
TC |
| 27 |
05/29/2009 |
TVA |
Access Channel Construction and Debris Removal Operations Work Plan |
7 |
TC |
| 28 |
06/01/2009 |
TVA |
Report to Our Community - June 2009 |
10 |
G |
| 29 |
06/09/2009 |
TVA |
Time Critical Land-Based Ash Removal East of Dike #2 Work Plan |
5 |
TC |
| 30 |
06/09/2009 |
TVA |
Settling Area Outlet Work Plan |
4 |
G |
| 31 |
06/10/2009 |
TVA |
Test Embayment Program |
168 |
TC |
| 32 |
06/10/2009 |
TVA |
Test Embankment Program |
6 |
NTC |
| 33 |
06/09/2009 |
TVA |
Ash Stacking Height in Processing Area Work Plan |
2 |
TC |
| 34 |
06/19/2009 |
TVA |
Swan Pond Road Construction Entrance Work Plan |
3 |
G |
| 35 |
06/19/2009 |
TVA |
Cenosphere Collection Area Consolidation Work Plan |
5 |
TC |
| 36 |
06/19/2009 |
TVA |
Swan Pond Embayment Sampling Plan |
7 |
TC |
| 37 |
06/19/2009 |
TVA |
Clean Water Ditch in the East Embayment Work Plan |
4 |
TC |
| 38 |
06/22/2009 |
TVA |
Loading Work Plan |
6 |
TC |
| 39 |
06/30/2009 |
TVA |
Site Storm Water Management Plan |
82 |
G |
| 40 |
06/30/2009 |
TVA |
Time Critical Land-Based Ash Removal East of Dike #2 Work Plan (Revised) |
13 |
TC |
| 41 |
06/30/2009 |
TDEC |
Disposal of Coal Ash Generated during the TVA Kingston Coal Ash Response |
4 |
TC |
| 42 |
06/30/2009 |
Jacobs |
Site Wide Safety and Health Plan |
319 |
|
| 43 |
07/02/2009 |
TVA |
Offsite Ash Disposal Options Plan |
20 |
TC |
| 44 |
07/13/2009 |
TVA |
Rim Ditch Hydraulic Improvements Work Plan |
5 |
TC |
| 45 |
07/20/2009 |
TVA |
Rim Ditch Structural Improvements Work Plan |
7 |
TC |
| 46 |
07/20/2009 |
TVA |
Phase I Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in AL, KY and TN |
3 |
TC |
| 47 |
07/20/2009 |
TVA |
Piezometer 09-400 Abandonment Work Plan |
4 |
G |
| 48 |
08/03/2009 |
Jacobs, for TVA |
Revised Site Dredging Plan July 2009 with Attachments |
188 |
TC |
| 49 |
08/05/2009 |
TVA |
Final Revised Action Memo with ARARs |
23 |
TC |
| 50 |
08/14/2009 |
TVA |
Site Dust Control and Air Monitoring Plan |
26 |
G |
| 51 |
08/14/2009 |
TVA |
Revised Temporary Ash Stockpile |
94 |
TC |
| 52 |
08/20/2009 |
TVA |
Financial expenditure report, the public notice of availability of the administrative record and the statement regarding the schedule for development of other work plans |
105 |
G |
53
|
08/20/2009 |
TVA |
Construction Site Security Plan (Revised) |
9 |
G |
54
|
08/25/2009 |
TVA |
Approved Surface Water Monitoring Plan for the Emory, Clinch and Tennessee Rivers |
86 |
G |
| 55 |
09/15/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Wet Ash Storage to Support Time Critical Land Signed Version |
6 |
TC |
| 56 |
10/16/2009 |
TVA |
EE/CA Work Plan |
136 |
NTC |
| 57 |
10/16/2009 |
TVA |
Draft Community Involvement Plan |
79 |
G |
| 58 |
10/19/2009 |
TVA |
Work Plan for Vehicle Wheel Wash and Decontamination |
5 |
G |
| 59 |
10/27/2009 |
TVA |
Approved Technical Assistance Plan and Draft RCCAG agreement |
18 |
G |
| 60 |
10/23/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Revised Cenosphere Collection Area Consolidation Work Plan Signed Version |
5 |
TC |
| 61 |
10/30/2009 |
TVA |
Settling Basins Maintenance and Clean Out Plan |
3 |
G |
| 62 |
11/10/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Lime Test Work Plan
(approved) |
4 |
TC |
| 63 |
11/10/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Time Critical Ash
Removal from East Embayment Work Plan (Approved document) |
7 |
TC |
| 64 |
11/10/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Technical Memorandum KIF Rainfall Sampling Events |
5 |
TC |
| 65 |
11/11/2009 |
TVA |
Approved SWPP addendum |
2 |
TC |
| 66 |
11/20/2009 |
TVA |
Transmittal Cover for Regulatory Submittal -Ball Field Modifications - Road & Drainage Work Plan |
5 |
TC |
| 67 |
11/25/2009 |
TVA |
Transmittal Cover for Regulatory Submittal - Excavator Removal |
32 |
TC |
| 68 |
11/30/2009 |
TVA |
Approved Data Management Plan |
54 |
G |
| 69 |
11/30/2009 |
TVA |
Construction of lateral expansion facilities - Phase 1 Work Plan |
4 |
TC |
| 70 |
12/03/2009 |
TVA |
Addendum to Construction of Lateral Expansion Facilities Phases 1 Approved Version |
11 |
TC |
| 71 |
12/02/2009 |
TVA |
Dike C Risk Mitigation Work Plan |
64 |
TC |
| 72 |
12/11/2009 |
TVA |
Mechanical Dewatering for Treatment of Ash Pond FinesWork Plan. |
8 |
TC |
| 73 |
12/09/2009 |
TVA |
Rail Modifications Work Plan |
6 |
TC |
| 74 |
12/10/2009 |
TVA |
Relic Area Piezometer Installation Work Plan |
9 |
TC |
| 75 |
12/18/2009 |
TVA |
Quality Assurance Project Plan for the TVA Kingston Ash Recovery Project(Approved) |
227 |
TC |
| 76 |
1/8/2010 |
TVA |
Settling Areas 1A & 2A Maintenance and Clean Out WorkPlan |
5 |
TC |
| 77 |
1/7/2010 |
TVA |
New Sluice Trench Road Work Plan |
43 |
TC |
| 78 |
1/18/2010 |
TVA |
Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) |
43 |
TC |
| 79 |
1/19/2010 |
TVA |
Approval to move 20 inch dredge to section 4 |
1 |
TC |
| 80 |
1/19/2010 |
TVA |
Engineering Evaluation/Cost Analysis (EE/CA) |
Various |
NTC |
| 81 |
1/21/2010 |
TVA |
Railroad Modification Work Plan |
27 |
TC |
| 82 |
1/22/2010 |
TVA |
EECA Work Plan Responsiveness Summary |
36 |
NTC |
| 83 |
1/22/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Lime Application in Ballfield |
4 |
TC |
| 84 |
2/18/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Ash Pond Mechanical Dredging Work Plan |
6 |
TC |
| 85 |
2/26/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Ball Field Reconfiguration Work Plan |
11 |
TC |
| 86 |
2/26/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Skimmer Wall Debris Removal Work Plan |
5 |
TC |
| 87 |
3/2/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Construction Operation of Excavation Workign Platform Extended Platform on Lateral Expansion Work Plan |
8 |
TC |
| 88 |
3/2/2010 |
TVA |
Approved Revised Site Wide Safety and Health Plan |
3 |
G |
| 89 |
3/4/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Test Embankment Buttress Work Plan, Revision 0 |
60 |
TC |
| 90 |
3/5/2010 |
TVA |
Transmittal Cover for Regulatory Submittal - Weir 1 Removal Work Plan |
8 |
TC |