tva logoTennessee Valley Authority
Kingston Ash Release

Administrative Record Documents Available for Public Review and Comment

The Tennessee Valley Authority is working with the Environmental Protection Agency to recover the site of the Kingston Fossil Plant ash spill. As part of that process, important site documents have been placed in the Administrative Record and are available for public review.  The Administrative Record includes documents that form the basis for the selection of the methods TVA is using to remove ash from the river and area east of Dike 2. Documents in the Administrative Record may include, but are not limited to, inspection reports, test results, the Action Memorandum, and work plans. All interested persons are encouraged to review the documents.

Site documents can be read and reviewed on this Web site or at the following locations:

Kingston Public Library
1004 Bradford Way
Kingston, Tennessee
(865) 376-9905

These same documents are available on computer disk at the following location:

Harriman Public Library
601 Walden Street
Harriman, Tennessee
(865) 882-3195

TVA conducts public comment periods to solicit public input on important site documents and the site recovery process.  To find out what public comment periods are in process and how to participate, please click here.

Index of Time Critical Documents in Adminstrative Record

Nbr Date Author Agency Title Pages
TC1 Feb. 2009 Shaw Environmental, Inc. Phase I Emory River Dredging Plan Kingston Fossil Plant Ash Recovery Project 50
TC2 02/24/2009 TVA RE: KIF Ash Processing Area Wick Drains 1
TC2-2 02/24/2009 TVA RE: KIF Ash Processing Area Wick Drains  
TC3 02/25/2009 TDEC Tennessee Valley Authority (TVA) Kingston Fossil Plant (KIF) - Commissioner's Order, Case No. OGC09-0001- Request for Use of Wick Drains in Ash Processing Area 7
TC4 02/25/2009 TDEC RE: Phase I Emory River Dredging Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-001 1
TC5 Mar-2009 TVA Kingston Fossil Plant - Fly Ash Recovery Projecct - Sampling Plan for Phase 1 Dredging Operations 60
TC6 03/02/2009 TDEC Re : Phase 1 Emory River Dredging  Plan and Ash Processing/Temporary Storage Facility - Approval under Commissioner's Order OGC09-0001 1
TC7 03/03/2009 TDEC RE: TDEC Response letter - TVA dredging  plan 1
TC8 03/18/2009 Environmental Standards, Inc. Quality Assurance Project Plan - Phase 1 Emory River Dredging - Kingston Fossil Plan Ash Recovery Project 146
TC9 03/19/2009 EPA Re: EPA Approval of sampling plan and QAPP for Phase 1 Dredging Plan.txt 1
TC10 03/20/2009 TVA Tennessee Valley Authority (TVA) - Commissioner's Order, Case Number OGC09-0001 - Request for Authorization to use Polymers to Enhance Treatment of Dredge Return Water 21
TC11 05/04/2009 TVA/Jacobs Ash Loading Test Plan 11
TC12 05/07/2009 TDEC Response to Comments of the Ash Loading Test 1
TC13 05/22/2009 TVA Railcar Unloading Operation Work Plan 3
TC14 05/22/2009 TVA Rail Spur Construction Work Plan 26
TC15 05/22/2009 TVA Ash Movement East of Dike #2 Work Plan 4
TC16 05/22/2009 TVA Construction/Implementation of Barge Offloading Area Work Plan 6
TC17 05/22/2009 TVA Work Plan for Dredge Relocation R0 5
TC18 05/29/2009 TVA Access Channel Construction and Debris Removal Operations Work Plan 7
TC19 06/09/2009 TVA Time Critical Land-Based Ash Removal East of Dike #2 Work Plan 5
TC20 06/10/2009 TVA Test Embayment Program 168
TC21 06/09/2009 TVA Ash Stacking Height in Processing Area Work Plan 2
TC22 06/19/2009 TVA Cenosphere Collection Area Consolidation Work Plan 5
TC23 06/19/2009 TVA Swan Pond Embayment Sampling Plan 7
TC24 06/19/2009 TVA Clean Water Ditch in the East Embayment Work Plan 4
TC25 06/22/2009 TVA Loading Work Plan 6
TC26 06/30/2009 TVA Time Critical Land-Based Ash Removal East of Dike #2 Work Plan (Revised) 13
TC27 06/30/2009 TDEC Disposal of Coal Ash Generated during the TVA Kingston Coal Ash Response 4

TC28

07/02/2009 TVA Offsite Ash Disposal Options Plan 20
TC29 07/13/2009 TVA Rim Ditch Hydraulic Improvements Work Plan 5
TC30 07/20/2009 TVA Rim Ditch Structural Improvements Work Plan 7
TC31 07/20/2009 TVA Phase I Facility Assessments for Coal Combustion Product Impoundments and Disposal Facilities in AL, KY and TN 3
TC32 08/03/2009 Jacobs, for TVA Revised Site Dredging Plan July 2009 with Attachments 188
TC33 08/05/2009 TVA Final Revised Action Memo with ARARs 23
TC34 08/14/2009 TVA Revised Temporary Ash Stockpile   94
TC35 09/15/2009 TVA Wet Ash Storage to Support Time Critical Land Signed Version 6
TC36 10/30/2009 TVA Settling Basins Maintenance and Clean Out Plan 3
TC37 10/23/2009 TVA Revised Cenosphere Collection Area Consolidation Work Plan Signed Version 5
TC38 11/10/2009 TVA Lime Test Work Plan (approved) 4
TC39 11/10/2009 TVA Time Critical Ash Removal from East Embayment Work Plan (Approved document) 7
TC40 11/10/2009 TVA Technical Memorandum KIF Rainfall Sampling Events 5
TC41 11/11/2009 TVA Approved SWPP addendum 2
TC42 11/20/2009 TVA Ball Field Modifications - Road & Drainage Work Plan 5
TC43 11/25/2009 TVA Excavator Removal Work Plan 32
TC44 11/30/2009 TVA Construction of lateral expansion facilities - Phase 1 Work Plan 4
TC45 12/03/2009 TVA Addendum to Construction of Lateral Expansion Facilities Phases 1 Approved Version 11
TC46 12/02/2009 TVA Dike C Risk Mitigation Work Plan 64
TC47 12/11/2009 TVA Mechanical Dewatering for Treatment of Ash Pond FinesWork Plan. 8
TC48 12/09/2009 TVA Rail Modifications Work Plan 6
TC49 12/10/2009 TVA Relic Area Piezometer Installation Work Plan 9
TC50 08/16/2010 TVA Quality Assurance Project Plan for the TVA Kingston Ash Recovery Project(Approved) 227
TC51 1/8/2010 TVA Settling Areas 1A & 2A Maintenance and Clean Out WorkPlan 5
TC52 1/7/2010 TVA New Sluice Trench Road Work Plan 43
TC53 1/18/2010 TVA Addendum to Ash Stacking Height in Processing Area Work Plan (with attatchment) 43
TC54 1/19/2010 TVA Approval to move 20 inch dredge to section 4 1
TC55 1/21/2010 TVA Railroad Modification Work Plan 27
TC56 1/22/2010 TVA Lime Application in Ballfield 4
TC57 2/18/2010 TVA Ash Pond Mechanical Dredging Work Plan 6
TC58 2/26/2010 TVA Ball Field Reconfiguration Work Plan 11
TC59 2/26/2010 TVA Skimmer Wall Debris Removal Work Plan 5
TC60 3/2/2010 TVA Construction Operation of Excavation Workign Platform Extended Platform on Lateral Expansion Work Plan 8

TC61

3/4/2010 TVA Test Embankment Buttress Work Plan, Revision 0 60

TC62

3/5/2010 TVA Weir 1 Removal Work Plan 8

TC63

3/15/2010 TVA Technical Memorandum Concerning Accuracy of Dredge Control Data Surface. 8

TC64

3/18/2010 TVA Valley Area 2 Temp Storage R1 18

TC65

3/24/2010 TVA Time-Critical Concurrence - Completion of Northern Portion of the East Embayment 16

TC66

3/26/2010 TVA Construction Support Geotechnical Investigation of East Dike Work Plan 7

TC67

3/29/2010 TVA Time Critical Concurrence for Dredge Areas G-64 to G69 25

TC68

3/30/2010 TVA Stantec Error Correction to Addendum 001 to Quality Control Plan 11

TC69

3/31/2010 TVA Time Critical Concurrence - To the east of Grids A45, 46 and 47(approved) 1

TC70

3/31/2010 TVA North Embayment Ash Consolidation Work Plan, Revision 4 5

TC71

3/31/2010 TVA Memorandum Concerning Change in location of Air Monitoring Stations 3

TC72

4/12/2010 TVA Construction_Operation of Excavation_Working Platform Extended Platform on Lateral Expansion Revision 1 11

TC73

4/12/2010 TVA Storage of Mechanically Dred Ash Storage Work Plan Rev 2 5

TC74

4/12/2010 TVA Time-Critical Concurrence - Ash Pond Material to be put on Dike D bank 4

TC75

4/13/2010 TVA Central Area Recontour Work Plan 8

TC76

4/13/2010 TVA Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas B-112, B-114 to B-118 11

TC77

4/13/2010 TVA Time-Critical Concurrence-Rookery Island 9

TC78

4/13/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas D-1 to 8 11

TC79

4/16/2010 TVA North Embayment Underpass Work Plan, Revision 1 37

TC80

4/16/2010 TVA Skimmer Wall Debris Removal Work Plan - Rev. 4 10

TC81

4/16/2010 TVA Lateral Expansion Platform Lime Treatment Work Plan 4

TC82

4/23/2010 TVA Time-Critical Concurrence-Emory River Segment 1, E-40 to E-43 8

TC83

4/28/2010 TVA Dredge Plan Addendum - Completion of Time Critical Removal Action 48

TC84

4/28/2010 TVA Dike C Buttress Work Plan 53

TC85

4/30/2010 TVA Time Critical Removal Action Completion Report for River System Phase II Nature and Extent of Ash Investigation 63

TC86

4/30/2010 TVA Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas D100 to D-104 8

TC87

4/30/2010 TVA Time-Critical Concurrence-Emory River Segment Above Segment 5, Dredge Areas A-100 to A-102 7

TC88

4/30/2010 TVA Time-Critical Concurrence-Emory River Segment 1, Dredge Areas D-39 and D-40 4

TC89

5/3/2010 TVA Time-Critical Concurrence-Emory River Segment Above Segment 5, Dredge Areas B-111 and C-112 6

TC90

5/7/2010 TVA Filter Press Demobilization Work Plan 22

TC91

5/7/2010 TVA Time-Critical Concurrence-Emory River Segment 1, D-44 to D-47 and E-44 To E-47 4

TC92

5/7/2010 TVA Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas B-103 and B-104 4

TC93

5/7/2010 TVA Time-Critical Concurrence-Emory River Segment 3, C-57 and C-58 4

TC94

5/7/2010 TVA Time-Critical Concurrence-Emory River Segment 1, C-49 to C-50, D-48 to D-51, E-48 to E-51 and F-50 to F-51 3

TC95

5/13/2010 TVA Time-Critical Concurrence-Emory River, Segment Above Segment 5, Dredge Areas portions of grid E-125, grid E-126, grid A-126, grid A-125 6

TC96

5/13/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, B-105 through B-107 4

TC97

5/14/2010 TVA Time Critical Concurrence for the Southern Portion of the East Embayment 59

TC98

5/14/2010 TVA Time-Critical Concurrence- Emory River, Segment 2, C-55, C-56, D-55, D-56,E-52 to E-56 and F-52 to F-56 95

TC99

5/14/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-121 through B-123 7

TC100

5/14/2010 TVA Time-Critical Concurrence- Emory River Segment 5 Dredge Areas A-1 to A-4 B-1 to B-4 9

TC101

5/17/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-20 through A-22 4

TC102

5/17/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-8, B8 through B-18, C-2, C-3 and C-15 4

TC103

5/17/2010 TVA Time-Critical Concurrence- Emory River, Segment 1, Dredge Areas B-47, C-35 through C-42, C-47 & C-48, D-31 through D-35 5

TC104

5/17/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, B-100 through B-102 4

TC105

5/21/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-121 through B-123 7

TC106

5/21/2010 TVA Time-Critical Concurrence-Emory River Segment 5, A-127, A-128, B-127, B-128, C-125 through C-128, D-125 & D-126 17

TC107

5/21/2010 TVA Time-Critical Concurrence-Emory River Segment 4, D-66, E-63 through E-66, F-63 through F-70 15

TC108

5/21/2010 TVA Time-Critical Concurrence- Emory River, Segment 3, D-57 and D-58 4

TC109

5/21/2010 TVA Time-Critical Concurrence Emory River, Segment 5, A-5 through A-7, A-9 through A-11 4

TC110

5/21/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, D-109, D-110, C-109 4

TC111

5/21/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, C-104, C-105 4

TC112

5/21/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, C-119 through C-122, D-119 through D-122 4

TC113

5/21/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, A-18 and A-19 4

TC114

5/21/2010 TVA Time-Critical Concurrence-Emory River Segment 5, A-127, A-128, B-127, B-128, C-125 through C-128, D-125 & D-126 4

TC115

5/25/2010 TVA Time Critical Concurrence - Emory River, Segment Above Above Segment 5, Emory River mile 6 to 5.9 4

TC116

5/25/2010 TVA Time-Critical Concurrence-Emory River Segment 2, G-53 to G-56 21

TC117

5/25/2010 TVA Time-Critical Concurrence-Emory River Segment 1, B-34, B-35, C-31 through C-34 36

TC118

5/25/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, D-111 to D-113 11

TC119

5/25/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, C-106 through C-108, D-105 through D-108 4

TC120

5/25/2010 TVA Time Critical Concurrence - Emory River Segment Above Segment 5, B-125, B-126, C-123 to C-126 and D-123, D-124 23

TC121

5/25/2010 TVA Time-Critical Concurrence Emory River,  Segment 4, D-67 through D-71 and E-67 through E-71 13

TC122

5/25/2010 TVA Time-Critical Concurrence-Emory River Segment 3, D-59 and D-60, E-57 to E-60, F-57 to F-60 and G-57 to G-59 39

TC123

5/25/2010 TVA Time Critical Concurrence - Emory River Segment 5, A-12 through A-17 33

TC124

5/25/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, C-116 to C-118 and D-116 to D-118 27

TC125

5/27/2010 TVA Sevenson Filter Press Demobilization Work Packages 2 and 3 64

TC126

5/27/2010 TVA Dredge Demobilization Work Plan 32

TC127

5/28/2010 TVA Time-Critical Concurrence- Emory River, Segment 1, B-27. C-27, and D-27 6

TC128

5/28/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas B-5 through B-7 and C-4 through C-7 6

TC129

5/28/2010 TVA Time Critical Concurrence- Emory River, Segment 5, A-23 6

TC130

6/1/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, Dredge Areas A-24 and A-25, B-25 and B-26, C-23 through C-26 and D-25 21

TC131

6/1/2010 TVA Time Critical Concurrence- Emory River Above Above Segment 5, Area 2, Emory River Mile 5.9 to 5.4 50

TC132

6/1/2010 TVA Time Critical Concurrence- Emory River, Segment 1, B-33 21

TC133

6/1/2010 TVA Time-Critical Concurrence Emory River, Segment Above Above 5, Area 4, Emory River mile 4.6 to 4.2 37

TC134

6/3/2010 TVA Time-Critical Concurrence Emory River, Segment Above Above 5, Area 3, Emory River Mile 5.1 to 4.8 61

TC135

6/3/2010 TVA Time-Critical Concurrence Emory River, Above Segment 5, C-100 through C-103 14

TC136

6/3/2010 TVA Time Critical Concurrence - Emory River, Segment Above Above Segment 5, Emory River mile 4.2 to 4.1 17

TC137

6/3/2010 TVA Time-Critical Concurrence- Emory River, Segment 5, B-19 through B-24 32

TC138

6/3/2010 TVA Corrective Action Plan for January 2010 Air Audit 8

TC139

6/23/2010 TVA Heavy Equiment Demobilization Plan 30

TC140

6/25/2010 TVA Time-Critical Concurrence - East of Dike 2 15

TC141

6/25/2010 TVA Time Critical Concurrence - Emory River, Segment East of Dike 2, Grids 28B1 and 29B1 3

TC142

6/25/2010 TVA Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grid 36a1 and 36B1 1

TC143

6/25/2010 TVA Time Critical Concurrence - Emory River, Segment “East of Dike 2”, Grids 37A1 through 37D1 15

TC144

6/25/2010 TVA TVA Quaterly Expenditure Report for period ending March 31, 2010 81

TC145

7/7/2010 TVA Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 38A1 through 42A1 10

TC146

7/7/2010 TVA Critical Concurrence - Emory River, Segment East of Dike 2, Grid 33A1 3

TC147

7/7/2010 TVA Time-Critical Concurrence - Emory River, Segment East of Dike 2, Land 5

TC148

7/7/2010 TVA Time-Critical Concurrence - East of Dike 2, North Point and Road to East Embayment 6

TC149

7/7/2010 TVA Time-Critical Concurrence - Emory River, Segment East of Dike 2 , Grid 33A1 3

TC150

7/7/2010 TVA Time- Critical Concurrence - Emory River, Segment 1, Grids B-40 & B-41 11

TC151

7/7/2010 TVA Time-Critical Concurrence for the Emory River, Segment 1, Grids B-36 through B-39 20

TC152

7/7/2010 TVA Time Critical Concurrence - Emory River, Segment 1, Grids B-42 & B-43 and C-43 16

TC153

7/7/2010 TVA Time Critical Concurrence - Emory River, Segment 1, Grid B44 to B-46 and C-44 to C-46 16

TC154

7/7/2010 TVA Time - Critical Concurrence - Emory River, Segment East of Dike 2, Grid 29A1 3

TC155

7/7/2010 TVA Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 31-B1 to 35-B1 and 34-A1 and 35-A1 7

TC156

7/7/2010 TVA Approved Time-Critical Concurrence - Emory River, Segment East of Dike 2, Grids 29C1, 29D1, 29E1, 30 C1 and 30 D1 15

TC157

7/7/2010 TVA Approved Time Critical Concurrence Emory River Segment 1, Grids B-28 through B-30, C-28 through C-30 and D-28 through D-30 25

TC157A

7/7/2010 TVA Time Critical Concurrence - Emory River, Segment East of Dike 2, Grids 30A1 and 31A1 3

TC158

8/3/2010 TVA Aquarius Debris Removal Demobilization Work Plan 9

TC159

8/3/2010 TVA Work Plan for Removal of Cantilevered Sheet Piling Wall, Revision 3 67

TC160

8/5/2010 TVA Support Services Equipment Demobilization Work Plan 5

TC161

8/23/2010 TVA Cenosphere Recovery Demobilization Work Plan 5

TC162

8/26/2010 TVA Time-Critical Concurrence – “Bob Summers’ Road” area East of Dike 2 57
TC163 8/30/2010 TVA Dike 2 Remediation Work Plan 52

TC164

7/7/2010 TVA Aquarius Debris Removal Demobilization Work Plan 9

TC165

9/14/2010 TVA Addendum to the Aquarius Debris Removal Demobilization Plan Decontamination of AM501 and AM504 7

TC166

9/21/2010 TVA Mactec Demobilization Plan 12

TC167

12/6/2010 TVA Aquarius Debris Removal Demobilization Plan Deontamination of AM 501 and AM 504 4

TC168

2/7/2010 TVA Dike C Buttress Work Plan - Segment A 60
TC 169
04/07/2001 TVA Intake Channel Bridge Removal Work Plan 12

TC170

05/20/2011 TVA Siphon Installation/Diffuser Removal Work Plan 12

TC171

05/27/2011 TVA Intake Channel Causeway Removal Work Plan 15

TC172

06/09/2011 TVA Dike C Buttress Work Plan − Segment B 185

 

 

 

Page Updated December 5, 2013 3:07 PM

Content for id "future1" Goes Here
Content for id "future2" Goes Here
Content for id "future3" Goes Here