Kingston Ash Release

Sampling and Analysis Plan

The following are Standard Operating Procedures (SOPs) for environmental sampling associated with the overall Quality Assurance Project Plan and applicable sampling and analysis plans conducted for the Kingston Ash Recovery Project.”

Index of Standard Operating Procedures

Nbr Revision Date Title
1 Dec 2009 Surface Water Sampling
2 Dec 2009 Groundwater Sampling
4
Mar 2009
Soil Sampling
5 Dec 2009 Sediment Sampling
6 Mar 2009 Field Documentation
7 Dec 2009 Sample Labeling Packing Shipping
8 Jan 2010 Decontamination
9 Aug 2009 Sediment Sampling for AVS/SEM Analysis
12 Feb 2010 Management of Investigation-Derived Material
15 Jan 2011 Collection and Processing of Heron, Osprey, and Canada Goose Eggs
18 May 2010 Management and Implementation of EQuIS™-Based Chain of Custody
24 Mar 2010 Drummed Material Sampling
28 Mar 2010 Sampling Tree Swallow Eggs and Nestlings
29 Mar 2010 Mayfly Sampling
30 Mar 2010 Aquatic Snail Sampling
31 Aug 2010 Fish Sampling With Gill Nets
32 Aug 2010 Fish Sampling with Seines
33 Aug 2010 Fish Sampling Using Boat-Mounted Electroshocker
38 Oct 2009 Vegetation Sampling
39 Jan 2010 Monitoring Well and Piezometer Installation and Completion
42 Dec 2009 Slug Testing
43 Dec 2009 Porewater Collection from Sediment and Ash
45 May 2010 Air Data Transfer to EQuIS™ and AQS Databases
46 Mar 2010 Groundwater Monitoring Well Abandonment
47 Mar 2010 Groundwater and Leachate Sampling Using Direct-Push Systems
49 Apr 10 Total Suspended Solids Determination
50 Mar 10 Paint Filter Liquids Test
51 Apr 10 Determination of pH
59 Sep 2010 Periphyton Sampling

 

 

 