Green Power Providers Dashboard

2017 Program Status – Megawatts (MW)

Applications executed CY 2017

  # Installs CY17 to date Installs Quarterly kW CY17 to date kW
Q1 2017 36 36 609.19 609.19

Wait List

If all available capacity in a pool (residential 5MW or non-residential 5MW) is reserved, any new Capacity Reservation Request (CRR) will be placed on a wait list. The wait list will hold up to 30 percent of each pool and be considered as capacity becomes available. CRRs on the wait list that are not utilized will not be carried over to the upcoming calendar year. These CRRs will be required to reapply in the new calendar year program.