Bull Run CCR Documents (Pond 2C)
Surface Impoundment - Fly Ash Stilling Pond 2C and Sluice Channel
Closure - Post-Closure Plan
Alternative Closure
- No documents at this time.
Closure Plan
Post-Closure Plan
Retrofitting
- No documents at this time.
Closure Status
Annual Closure Implementation Report
- No documents at this time.
Closure by Completion Notification
- 257-102(h)_Notification of Completion of Closure_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 68 KB)
NOI to Initiate Closure
Design Criteria
Emergency Action Plan
- 257-73(a)(3)_Most Recent Emergency Action Plan_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2023 (pdf, 3051 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2024 (pdf, 28 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2023 (pdf, 27 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2022 (pdf, 227 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2021 (pdf, 229 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2020 (pdf, 28 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2019 (pdf, 222 KB)
- 257-73(a)(3)(i)(E) _Annual Face-to-Face meeting_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 165 KB)
Hazard Potential Classification
- 257-73(a)(2)_Periodic Hazard Potential Classification_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2023 (pdf, 3946 KB)
- 257-73(a)(2)_Hazard Potential Classification_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 4907 KB)
History of Construction
Liner Design
- 257-71_Liner Design_BRF_Stilling Pond 2C and Sluice Channel (pdf, 1957 KB)
Marker
- No documents at this time.
Safety Factor
- 257-73(e) _Safety Factor_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 1099 KB)
- 257-73(e) _Periodic Safety Factor_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2023 (pdf, 14 KB)
Structural Stability
- 257-73(d)_Structural Stability_BRF_Stilling Pond 2C and Sluice Channel (pdf, 821 KB)
- 257-73(d)_Periodic Structural Stability_BRF_Stilling Pond 2C and Sluice Channel 2023 (pdf, 923 KB)
Groundwater Monitoring
Annual Groundwater Report
- 257-90(e)_Annual_Groundwater_Monitoring_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel_2022 (pdf, 5987 KB)
- 257-90(e)_Annual_Groundwater_Monitoring_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel_2021 (pdf, 9454 KB)
- 257-90(e)_Annual Groundwater Monitoring Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2023 (pdf, 5230 KB)
- 257-90(e)_Annual Groundwater Monitoring Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2020_2 (pdf, 4060 KB)
- 257-90(e)_Annual Groundwater Monitoring Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2020 (pdf, 904 KB)
- 257-90(e)_Annual Groundwater Monitoring Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 4270 KB)
Assessment Monitoring
- 257-95(g)_notification_appiv_gwps_exceed_BRF_fly_ash_stilling_pond_and_sluice_channel_year_end_2023 (pdf, 191 KB)
- 257-95(g)_notification_appiv_gwps_exceed_BRF_fly_ash_stilling_pond_and_sluice_channel_midyear_2023 (pdf, 159 KB)
- 257-95(g)_Notification_AppIV_GWPS_Exceed_BRF_Fly_Ash_Stilling_Pond_2C_Sluice_Channel_2022 (pdf, 166 KB)
- 257-95(g)_Notification_Appiv_GWPS_Exceed_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2022_End of Year (pdf, 162 KB)
- 257-95(g)_notification_appiv_gwps_BRF_fly_ash_stilling_pond_sluice_channel_main_ash_pond_mid_year_2024 (pdf, 192 KB)
- 257-95(g)_Notification AppIV GWPS Exceed_BRF_Fly Ash Stilling Pond 2C and Sluice Channel_2021 (pdf, 169 KB)
- 257-95(g)_Notification AppIV GWPS Exceed_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 128 KB)
- 257-94(e)(3)_Assessment Monitoring Notification_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 91 KB)
Corrective Measures
- 257.97(a)_2024_7th_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 5371 KB)
- 257.97(a)_2024_6th_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 4770 KB)
- 257.97(a)_2023_5th_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 3394 KB)
- 257.97(a)_2023_4th_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 4740 KB)
- 257.97(a)_2022_3rd_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 10060 KB)
- 257.97(a)_2022_2nd_Semiannual_Progress_Report_BRF_Fly_Ash_Stilling_Pond_2C_and_Sluice_Channel (pdf, 8824 KB)
- 257.97(a)_2021_1st Semiannual Progress Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 5897 KB)
- 257.96(d)_Corrective Measures Assessment_BRF_Fly Ash Stilling Pond 2C Sluice Channel (pdf, 4042 KB)
- 257.95(g)(5)_Corrective Measures Notification_ BRF_Fly Ash Stilling Pond 2C Sluice Channel (pdf, 77 KB)
Detection Monitoring
- No documents at this time.
Groundwater Instrumentation
- 257.93(f)(6)_Statistical Method Cert._ BRF Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 1920 KB)
- 257.91(f)_GW Monitoring System Cert._BRF Fly Ash Stilling Pond 2C and Sluice Channel (pdf, 2058 KB)
Location Restrictions
Fault Areas
Placement Above the Uppermost Aquifer
Seismic Impact Zones
Unstable Areas
Wetlands
Operating Criteria
Air Criteria
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2023 (pdf, 107 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2022 (pdf, 107 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2021 (pdf, 108 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2017 (pdf, 20 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2020 (pdf, 286 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2019 (pdf, 108 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2018 (pdf, 20 KB)
- 257-80(b)_Fugitive Dust Control Plan_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2019 (pdf, 1008 KB)
Inflow Design Flood Controls
- 257-82(c)_Periodic Inflow Design Flood Controls_BRF_Stilling Pond 2C and Sluice Channel 2023 (pdf, 970 KB)
- 257-82(c)_Inflow Design Flood Controls_BRF_Stilling Pond 2C and Sluice Channel (pdf, 572 KB)
Inspection Requirements
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2023 (pdf, 8502 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2022 (pdf, 7027 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2021 - 2nd Inspection (pdf, 7852 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2021 (pdf, 9760 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2020 (pdf, 4117 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2019 (pdf, 32334 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2018 (pdf, 32113 KB)
- 257-83(b)(2)_Annual Inspection Report_BRF_Fly Ash Stilling Pond 2C and Sluice Channel 2017 (pdf, 23441 KB)