Skip to main content

Kingston CCR Documents (Peninsula)

Landfill - Peninsula Disposal Area

 

Closure - Post-Closure Plan

Alternative Closure

  • No documents at this time.

Closure Plan

Post-Closure Plan

Retrofitting

  • No documents at this time.

 

Groundwater Monitoring

Annual Groundwater Report

Assessment Monitoring

  • No documents at this time.

Corrective Measures

  • No documents at this time.

Detection Monitoring

  • No documents at this time.

Groundwater Instrumentation

 

Location Restrictions

Unstable Areas

 

Operating Criteria

Air Criteria

Inspection Requirements

Run-on - Run-off Controls