Skip to main content

Systems Operations Center operators keep the grid reliable

Driving the Bus

These TVA system operators are constantly on alert to synchronize electricity generation with customer demand.

First Solar

The Sun is Shining

With the arrival of First Solar’s manufacturing facility, new opportunities open in North Alabama and beyond.

MoonPie display

Powering MoonPies

TVA EnergyRight incentives equal big savings for an iconic American snack.

Solar panels

Working Toward a Cleaner Energy Future

Proposed solar and gas projects in Tennessee and Mississippi could produce nearly 700 megawatts.

Standing in water with siene net.

Everything Under the Sun

At a North Alabama site, rare fish, native grasslands and solar energy flourish together.

Solar panels

Let the Sun Shine

The project is the first of three renewable energy projects Origis plans for the Magnolia State, bringing 550 MW of solar power and 150 MW of battery storage into operation.

Bee lands on flower

Powered for Summer

As warm weather arrives, TVA is ready to keep you cool and comfortable.

Smartflower solar panels

Flower Power

TVA showcases innovative solar power technology near Chickamauga Dam.

Clinch River and Kingston Fossil Plant

Megawatts in the Megastorm

TVA’s winter preparedness shines as bitter cold snap fuels record energy demand.

Gallatin Turbine Plant Winterization Project

Buttoning Up the Winter To-Do List

TVA teams are wrapping up about 3,400 cold-weather upgrades at plants around the Valley region.