Skip to main content

Gallatin CCR Documents (NRL Cell 2)

Landfill - North Rail Loop Landfill Cell 2

 

Closure - Post-Closure Plan

Alternative Closure

    No documents at this time.

Closure Plan

Post-Closure Plan

Retrofitting

    No documents at this time.

 

design Criteria

Liner & Leachate Collection System

 

Groundwater Monitoring

Annual Groundwater Report

Assessment Monitoring

Corrective Measures

    No documents at this time.

Detection Monitoring

    No documents at this time.

Groundwater Instrumentation

 

Location Restrictions

Fault Areas

Placement Above the Uppermost Aquifer

Seismic Impact Zones

Unstable Areas

Wetlands

 

Operating Criteria

Air Criteria

Inspection Requirements

Run-on - Run-off Controls