Paradise CCR Documents (Slag Ponds 2A & 2B)
Surface Impoundment - Slag Ponds 2A and 2B
Closure - Post-Closure Plan
No documents at this time.
No documents at this time.
Hazard Potential Classification
No documents at this time.
Annual Groundwater Report
No documents at this time.
Groundwater Instrumentation
Placement Above the Uppermost Aquifer
Inflow Design Flood Controls