Shawnee CCR Documents (New Landfill)
Landfill - New CCR Landfill
Closure - Post-Closure Plan
Alternative Closure
- No documents at this time.
Closure Plan
- 257102b_Written Closure Plan_SHF_New CCR Landfill (pdf, 243 KB)
Post-Closure Plan
- 257104d_Written PostClosure Plan_SHF_New CCR Landfill (pdf, 243 KB)
Retrofitting
- No documents at this time.
Design Criteria
Liner & Leachate Collection System
- SHF_New CCR Landfill_LIner & Leachate Collection System Demonstration (pdf, 336 KB)
- 25770f_Liner & Leachate Construction_SHF_New CCR Landfill (pdf, 107 KB)
Groundwater Monitoring
Annual Groundwater Report
- 257.90(e)_Annual_Groundwater_Monitoring_Report_SHF_New_Landfill_2023 (pdf, 2726 KB)
- 257.90(e)_Annual_Groundwater_Monitoring_Report_SHF_New_Landfill_2022 (pdf, 6669 KB)
- 257.90(e)_Annual_Groundwater_Monitoring_Report_SHF_New_Landfill_2021 (pdf, 6631 KB)
Assessment Monitoring
- No documents at this time.
Corrective Measures
- No documents at this time.
Detection Monitoring
- No documents at this time.
Groundwater Instrumentation
- 25793f6_Statistical Method Cert_SHF_New CCR Landfill (pdf, 297 KB)
- 25791f_GW Monitoring System Cert_SHF_New CCR Landfill (pdf, 2036 KB)
Location Restrictions
Fault Areas
- fault_areas ccr demo (pdf, 5920 KB)
Placement Above the Uppermost Aquifer
- 25760_Aquifer_SHF_New CCR Landfill (pdf, 819 KB)
Seismic Impact Zones
- Seismic CCR demo (pdf, 714 KB)
Unstable Areas
- unstable_areas CCR demo (pdf, 539 KB)
Wetlands
- wetlands CCR demo (pdf, 194 KB)
Operating Criteria
Air Criteria
- 25780b5_Fugitive Dust Control Plan_SHF_New CCR Landfill (pdf, 239 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_SHF_New CCR Landfill 2024 (pdf, 172 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_SHF_New CCR Landfill 2023 (pdf, 128 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_SHF_New CCR Landfill 2022 (pdf, 129 KB)
- 257-80(c)_Annual Fugitive Dust Control Report_SHF_New CCR Landfill 2021 (pdf, 128 KB)
Inspection Requirements
- 257-84(b)(2)_Annual Inspection Report_SHF_New CCR Landfill 2024 (pdf, 6240 KB)
- 257-84(b)(2)_Annual Inspection Report_SHF_New CCR Landfill 2023 Rev 1 (pdf, 7076 KB)
- 257-84(b)(2)_Annual Inspection Report_SHF_New CCR Landfill 2022 (pdf, 4893 KB)
Run-on - Run-off Controls
- 25781c_Runon Runoff Controls_SHF_New CCR Landfill (pdf, 4058 KB)